CO129-305 - Governor Sir Blake - 1901 [5-7] — Page 274

CO129 Colonial Office Hong Kong Records 理藩院香港檔案 All AI Reviewed

268

Forming Verandah to Ground Plan

I wish to point out that if it be considered desirable to construct an open Verandah to the Ground Floor, such can be done by continuing the Vestibules along all sides, the general design of which would be as shown.

Estimated cost.

I estimate the cost according to the enclosed Bill of Quantities to be as follows:-

Power, including Electric Light, Lightning conductor, Furniture, etc.
Roof to Pier
Total

$97,732 $4,635 $108,867

In conclusion, I would state that I endeavoured to design a Tower which shall be considered worthy of such an important centre as Hongkong is, but at the same time, in consequence of having been without actual information as to the cost the Government were prepared to meet in the construction of such a Tower, I have endeavoured to provide for such alterations as may meet such contingencies in construction as might increase or diminish cost.

Room for Watchman.

As it might be considered well to have an additional floor near the top of Tower to serve as a room for a Watchman in case of fire or other emergencies, I have shown a floor on Drawing No. 4, but the cost of this is not included in the estimate submitted. In any case, such an addition would not amount to much.

Edit History

2026-05-31 18:19:45 · NVIDIA / meta/llama-4-maverick-17b-128e-instruct
Live
View comparison
AI Proofread
268 Forming Verandah to Ground Plan I wish to point out that if it be considered desirable to construct an open Verandah to the Ground Floor, such can be done by continuing the Vestibules along all sides, the general design of which would be as shown. Estimated cost. I estimate the cost according to the enclosed Bill of Quantities to be as follows:- Power, including Electric Light, Lightning conductor, Furniture, etc. Roof to Pier Total $97,732 $4,635 $108,867 In conclusion, I would state that I endeavoured to design a Tower which shall be considered worthy of such an important centre as Hongkong is, but at the same time, in consequence of having been without actual information as to the cost the Government were prepared to meet in the construction of such a Tower, I have endeavoured to provide for such alterations as may meet such contingencies in construction as might increase or diminish cost. Room for Watchman. As it might be considered well to have an additional floor near the top of Tower to serve as a room for a Watchman in case of fire or other emergencies, I have shown a floor on Drawing No. 4, but the cost of this is not included in the estimate submitted. In any case, such an addition would not amount to much.
Baseline (Original)
268 Forming Verandah to Ground Planı I wish to point out that if it: be const- dered desirable to construct an open Varandah to the Ground Floor,"such can be done by continuing the Vestibules along all sides, the general design of which would be as how: Y Estimated cost." I estimate the cost according to the en- closed Bill of Quantities to be as follows:- Power, including Electric Light, Lightning conductor, Parniture stoste Roof to Pier Potal # $97,732 4,635 $ 108,867.1 In conclusion I would state that I. en- deavoured to design a Tower which shall be considerad worthy of such an ir- portant: centre as Hongkong is, but at the same time in sonsequence of having been without actual information as to the cost: the Government were prepared. to meet in the construction of such a Tower, I have endeavoured to -provide for such alterations as may neat such contingencies in construction as might increase or diminish. coat." Room for Watchman.? As it might be considered well to have an } additional floor near the top of Tower to serve as a room for a Watchman in case of fire or other emergencies, I have shown a floor on Drawing No. 4, bat the cost of this is not included in the estimate submitted. In any case such an addition would not amount to such,
2026-05-31 18:19:45 · Baseline
View content

268

Forming Verandah to Ground Planı

I wish to point out that if it: be const- dered desirable to construct an open Varandah to the Ground Floor,"such can be done by continuing the Vestibules along all sides, the general design of which would be as how: Y

Estimated cost."

I estimate the cost according to the en-

closed Bill of Quantities to be as follows:-

Power, including Electric Light, Lightning

conductor, Parniture stoste

Roof to Pier

Potal

#

$97,732 4,635

$ 108,867.1

In conclusion I would state that I. en-

deavoured to design a Tower which shall be considerad worthy of such an ir- portant: centre as Hongkong is, but at the same time in sonsequence of having been without actual information as to the cost: the Government were prepared. to meet in the construction of such a Tower, I have endeavoured to -provide for such alterations as may neat such contingencies in construction as might increase or diminish. coat."

Room for Watchman.?

As it might be considered well to have an

}

additional floor near the top of Tower to serve as a room for a Watchman in case of fire or other emergencies, I have shown a floor on Drawing No. 4, bat the cost of this is not included in the estimate submitted. In any case such

an addition would not amount to such,